All-Inclusive Factory Service Technical manual for Hitachi Hydraulic Excavators Models EX1200-5C .
This manuals will assist you in diagnosing, repairing, troubleshooting, repairing engine, maintaining, operating, assembling, and checking for your hydraulic excavator.
You can use a Windows, Mac, or Android device to view this manuals. You only need to have a PDF reader installed.
Covered Models:
EX1200-5C (S6R Engine)
The manual comprises 20 documents, including five Workshop Manuals, the Troubleshooting Manual, Engine Technical Manual, Maintenance Manual, Operational Principle Manual, Wiring Diagram, Assembly Manual, Training Text, and 8 Check Sheets
1. Workshop Manual: Swing Motor (WSDSME17F2)
Format: PDF, 146 pages
Language: English
2. Workshop Manual: Pump Transmission (WSDPDE17F1)
Format: PDF, 122 pages
Language: English
3. Workshop Manual: Main Pump (WSDMPDE17F2)
Format: PDF, 152 pages
Language: English
4. Workshop Manual (W183E00)
Format: PDF, 467 pages
Language: English
Table of Contents:
GENERAL INFORMATION
Precautions for Disassembling and Assembling
Tightening
UPPERSTRUCTURE
Cab
Counterweight
Pump Device
Control Valve
Swing Device
Pilot Valve
Pilot Shut-off Valve
Shockless Valve
Solenoid Valve
Signal Control Valve
Oil Cooler Fan Motor
UNDERCARRIAGE
Swing Bearing
Travel Device
Center Joint
Track Adjuster
Front Idler
Upper And Lower Roller
Track
FRONT ATTACHMENT
Front Attachment
Cylinder
Bushing and Point
5. Workshop Manual: Travel Transmission (WSDTDE17F1)
Format: PDF, 166 pages
Language: English
6. Troubleshooting Manual (TT18EE00)
Format: PDF, 350 pages
Language: English
Table of Contents:
OPERATIONAL PERFORMANCE TEST
INTRODUCTION
STANDARD
ENGINE TEST
EXCAVATOR TEST
COMPONENT TEST
TROUBLESHOOTING
GENERAL
CROSS REFERENCE TABLE
COMPONENT LAYOUT
TROUBLESHOOTING A
TROUBLESHOOTING B
TROUBLESHOOTING C
TROUBLESHOOTING D
ELECTRICAL SYSTEM INSPECTION
7. Engine Technical Manual (KM926E03)
Format: PDF, 302 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
How to Use This Manual
Safety Cautions
GENERAL CONTENTS
GENERAL
1. Outline
2. Main specification
3. Tips on Disassembly and Reassembly
MAINTENANCE STANDARDS
1. Maintenance Standards Table
2. Tightening Torque Table
3. Sealants and Lubricants Table
BASIC AND SPECIAL TOOLS
1. Commercially-available Tools
2. Special Tools
OVERHAUL INSTRUCTIONS
1. Determination of Overhaul Timing
2. Testing Compression Pressure
DISASSEMBLY OF ENGINE MAIN PARTS
1. Disassembly of cylinder heads and valve mechanisms
2. Disassembly of flywheel, timing gear, camshaft, oil pan and oil strainer
3. Disassembly of damper and pulleys
4. Disassembly of cylinder liner, piston and connecting rod
5. Disassembly of crankcase, crankshaft and main bearings
INSPECTION AND REPAIR OF ENGINE PARTS
1. Cylinder head and valve mechanism
2. Cylinder Liner, Piston and Connecting Rod
3. Damper and crankshaft pulley
4. Flywheel, timing gear and camshaft
5. Crankcase, crankshaft and main bearing
REASSEMBLY OF ENGINE MAIN PARTS
1. Reassmbly of Crankcase, Crankshaft and Main Bearing
2. Reassmbly of Cylinder Liner, Piston and Connecting Rod
3. Reassmbly of Damper
4. Reassmbly of Flywheel, Timing Gear and Camshaft
5. Reassmbly of Cylinder Head and Valve Mechanism
FUEL SYSTEM
1. Disassembling of the fuel system
2. Disassembling, inspection and assembling of the fuel system
3. Assembling the fuel system
LUBRICATION SYSTEM
1. Removal of lubrication system
2. Disassembly and inspection of lubrication system
3. Installation of lubrication system
COOLING SYSTEM
1. Removal of Cooling System
2. Disassembly, Inspection and Reassembly of Cooling System
3. Reinstallation of Cooling System
INLET AND EXHAUST SYSTEMS
1. Exhaust Manifold
2. Turbocharger
3. Air Heater
ELECTRICAL SYSTEM
1. Removal of electrical system
2. Disassembly, Inspection and Reassembly of Electrical System
3. Installation of electrical system
ADJUSTMENT BREAK-IN OPERATION AND PERFORMANCE TESTS
1. Adjustment of engine
2. Adjustment of actuator control linkage
3. Break-In Operation
4. Performance Tests
5. Inspection procedure of dismounted engine
OTHERS
1. Dissassembly and Reassembly of General parts
ADJUSTING PROCEDURE OF ELECTRONIC GOVERNOR CONTROLS
1. Introduction
2. Preparation for adjustment
3. Connection of Personal Computer and Actuator Controller
4. Service program start-up
5. Controller setting item chart
6. Checks before parts and/or controller setting change
7. Parts change
8. Adjustment of control link and controller
9. Resetting of protection
10. Disconnection of PC and actuator controller
11. Confirmation of stop solenoid
12. Confirmation of engine stop
13. Personal Computer Set-up (How the check when computer program does not start)
14. Malfunction display
15. Tunable Value List
SERVICE MANUAL REVISION REQUEST FORM
8. Maintenance Manual: Recomended Service Program (KO27600)
Format: PDF, 42 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
MAJOR COMPONENTS PREVENTIVE SERVICE SCHEDULE
HITACHE SCHEDULED DIAGNOSTIC SERVICE
CHECK LISTS FOR PERFORMANCE AND COMPONENTS
RECOMMENDATION OF PREVENTIVE SERVICE TO CUSTOMER
RECOMMENDED PARTS CATALOG FOR PREVENTIVE SERVICE
9. Operational Principle Manual (TO18EE-00)
Format: PDF, 246 pages
Language: English
Table of Contents:
GENERAL
SPECIFICATIONS
COMPONENT LAYOUT
SYSTEM
CONTROL SYSTEM
HYDRAULIC SYSTEM
ELECTRICAL SYSTEM
COMPONENT OPERATION
PUMP DEVICE
SWING DEVICE
CONTROL VALVE
PILOT VALVE
TRAVEL DEVICE
SIGNAL CONTROL VALVE
OTHERS(UPPERSTRUCTURE)
OTHERS(UNDERCARRIAGE)
10. Wiring Diagram (TT183E00CIR)
Format: PDF, 4 pages
Language: English
11. Assembly Manual (KO26900_POD)
Format: PDF, 192 pages
Language: English
Table of Contents:
COVER
Foreword
1. Precautions
2. Workers plan (Loader front)
2'. Workers plan (Backhoe front)
3. Parts check
4. Preparations (Loader front)
5. Preparations (Backhoe front)
6. Machines, apparatus, tools, and materials necessary for assembly
ASSEMBLY OF UPPERSTRUCTURE
MOUNTING PROCEDURE FOR LOADER FRONT-END ATTACHMENT
MOUNTING PROCEDURE FOR BACKHOE FRONT-END ATTACHMENT
CHECKS & PERFORMANCE STANDARDS
10. Check after completing of assembly
11. Checking machine performance
BACK COVER
12. Training Text: EX1200-5-5c Tech ILT (EX1200-5-5c_Tech_ILT)
Format: PDF, 289 pages
Language: English
13. Check Sheets: UT Inspection (Backhoe Front) (KO274BE00)
Format: PDF, 52 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
DISTRIBUTION OF THE INSPECTION SHEET
DEFINITION OF THE DEFECT LENGTH IN ULTRA-SONIC
INSPECTION PROCEDURE
EVALUATION OF DEFECT HEIGHT (H)BY DISTANCE CORRECTION TECHNIQUE AT INTERNAL BULKHEAD
ULTRA-SONIC EXAMINATION REPORT FOR THE STRUCTURE
Track Frame
Loader Boom
Loader Arm
14. Check Sheets: UT Inspection (Loader Front) (ko274l00)
Format: PDF, 58 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
DISTRIBUTION OF THE INSPECTION SHEET
DEFINITION OF THE DEFECT LENGTH IN ULTRA-SONIC TESTING
INSPECTION PROCEDURE
EVALUATION OF DEFECT HEIGHT(H)BY DISTANCE CORRECTION TECHNIQUE AT INTERNAL BULKHEAD
ULTRA-SONIC EXAMINATION REPORT FOR THE STRUCTURE
Track Frame
Loader Boom
Loader Arm
15. Check Sheets: Visual Inspection (Loader Front) (KO275L00)
Format: PDF, 38 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
COMPLETING AND SUBMITTING THE INSPECTION SHEETS
INSPECTION PROCEDURE
STRUCTURE VISUAL INSPECTION CHECK REPORT
Track Frame
Side Frame
Main Frame
Loader Boom
Loader Arm
16. Check Sheets: Completed Assembly (KO27000)
Format: PDF, 25 pages
Language: English
Table of Contents:
COVER
FOREWORD
COMPLETED ASSEMBLY CHECK REPORT FOR THE EX1200-5
UNDERCARRIAGE/SUPERSTRUCTURE
FRONT-END ATTACHEMNT
ELECTRICAL SYSTEM FUNCTION CHECK SHEETS
IMPLEMENT SPEED CHECK SHEETS
17. Check Sheets: Daily and Weekly Maintenance (KO27100)
Format: PDF, 5 pages
Language: English
18. Check Sheets: Monthly Maintenance (KO27200)
Format: PDF, 55 pages
Language: English
Table of Contents:
COVER
1. 50 TO 1250 HOURS
2. 1500 TO 2500 HOURS
3. 2750 TO 3750 HOURS
4. 4000 TO 5000 HOURS
5. 5250 TO 6250 HOURS
6. 6500 TO 7500 HOURS
7. 7750 TO 8750 HOURS
8. 9000 TO 10000 HOURS
9. 10250 TO 11250 HOURS
10. 11500 TO 12500 HOURS
11. 12750 TO 13750 HOURS
12. 14000 TO 15000 HOURS
13. 15250 TO 16250 HOURS
14. 16500 TO 17500 HOURS
15. 17750 TO 18750 HOURS
16. 19000 TO 20000 HOURS
19. Check Sheets: Parts Visual Check (ko27300)
Format: PDF, 41 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
INSPECTION PROCEDURE
PRECAUTIONS FOR INSPECTION
PRECAUTIONS IN USING THE PARTS VISUAL CHECK SHEET
PIPING SYSTEM
ELECTRIC PARTS
IMPORTANT CHECKS
20. Check Sheets: Visual Inspection (Bachkhoe Front) (KO275BE00)
Format: PDF, 40 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
COMPLETING AND SUBMITTING THE INSPECTION SHEETS
INSPECTION PROCEDURE
STRUCTURE VISUAL INSPECTION CHECK REPORT
Track Frame
Side Frame
Main Frame
Backhoe BE Boom
Backhoe Arm
This manuals will assist you in diagnosing, repairing, troubleshooting, repairing engine, maintaining, operating, assembling, and checking for your hydraulic excavator.
You can use a Windows, Mac, or Android device to view this manuals. You only need to have a PDF reader installed.
Covered Models:
EX1200-5C (S6R Engine)
The manual comprises 20 documents, including five Workshop Manuals, the Troubleshooting Manual, Engine Technical Manual, Maintenance Manual, Operational Principle Manual, Wiring Diagram, Assembly Manual, Training Text, and 8 Check Sheets
1. Workshop Manual: Swing Motor (WSDSME17F2)
Format: PDF, 146 pages
Language: English
2. Workshop Manual: Pump Transmission (WSDPDE17F1)
Format: PDF, 122 pages
Language: English
3. Workshop Manual: Main Pump (WSDMPDE17F2)
Format: PDF, 152 pages
Language: English
4. Workshop Manual (W183E00)
Format: PDF, 467 pages
Language: English
Table of Contents:
GENERAL INFORMATION
Precautions for Disassembling and Assembling
Tightening
UPPERSTRUCTURE
Cab
Counterweight
Pump Device
Control Valve
Swing Device
Pilot Valve
Pilot Shut-off Valve
Shockless Valve
Solenoid Valve
Signal Control Valve
Oil Cooler Fan Motor
UNDERCARRIAGE
Swing Bearing
Travel Device
Center Joint
Track Adjuster
Front Idler
Upper And Lower Roller
Track
FRONT ATTACHMENT
Front Attachment
Cylinder
Bushing and Point
5. Workshop Manual: Travel Transmission (WSDTDE17F1)
Format: PDF, 166 pages
Language: English
6. Troubleshooting Manual (TT18EE00)
Format: PDF, 350 pages
Language: English
Table of Contents:
OPERATIONAL PERFORMANCE TEST
INTRODUCTION
STANDARD
ENGINE TEST
EXCAVATOR TEST
COMPONENT TEST
TROUBLESHOOTING
GENERAL
CROSS REFERENCE TABLE
COMPONENT LAYOUT
TROUBLESHOOTING A
TROUBLESHOOTING B
TROUBLESHOOTING C
TROUBLESHOOTING D
ELECTRICAL SYSTEM INSPECTION
7. Engine Technical Manual (KM926E03)
Format: PDF, 302 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
How to Use This Manual
Safety Cautions
GENERAL CONTENTS
GENERAL
1. Outline
2. Main specification
3. Tips on Disassembly and Reassembly
MAINTENANCE STANDARDS
1. Maintenance Standards Table
2. Tightening Torque Table
3. Sealants and Lubricants Table
BASIC AND SPECIAL TOOLS
1. Commercially-available Tools
2. Special Tools
OVERHAUL INSTRUCTIONS
1. Determination of Overhaul Timing
2. Testing Compression Pressure
DISASSEMBLY OF ENGINE MAIN PARTS
1. Disassembly of cylinder heads and valve mechanisms
2. Disassembly of flywheel, timing gear, camshaft, oil pan and oil strainer
3. Disassembly of damper and pulleys
4. Disassembly of cylinder liner, piston and connecting rod
5. Disassembly of crankcase, crankshaft and main bearings
INSPECTION AND REPAIR OF ENGINE PARTS
1. Cylinder head and valve mechanism
2. Cylinder Liner, Piston and Connecting Rod
3. Damper and crankshaft pulley
4. Flywheel, timing gear and camshaft
5. Crankcase, crankshaft and main bearing
REASSEMBLY OF ENGINE MAIN PARTS
1. Reassmbly of Crankcase, Crankshaft and Main Bearing
2. Reassmbly of Cylinder Liner, Piston and Connecting Rod
3. Reassmbly of Damper
4. Reassmbly of Flywheel, Timing Gear and Camshaft
5. Reassmbly of Cylinder Head and Valve Mechanism
FUEL SYSTEM
1. Disassembling of the fuel system
2. Disassembling, inspection and assembling of the fuel system
3. Assembling the fuel system
LUBRICATION SYSTEM
1. Removal of lubrication system
2. Disassembly and inspection of lubrication system
3. Installation of lubrication system
COOLING SYSTEM
1. Removal of Cooling System
2. Disassembly, Inspection and Reassembly of Cooling System
3. Reinstallation of Cooling System
INLET AND EXHAUST SYSTEMS
1. Exhaust Manifold
2. Turbocharger
3. Air Heater
ELECTRICAL SYSTEM
1. Removal of electrical system
2. Disassembly, Inspection and Reassembly of Electrical System
3. Installation of electrical system
ADJUSTMENT BREAK-IN OPERATION AND PERFORMANCE TESTS
1. Adjustment of engine
2. Adjustment of actuator control linkage
3. Break-In Operation
4. Performance Tests
5. Inspection procedure of dismounted engine
OTHERS
1. Dissassembly and Reassembly of General parts
ADJUSTING PROCEDURE OF ELECTRONIC GOVERNOR CONTROLS
1. Introduction
2. Preparation for adjustment
3. Connection of Personal Computer and Actuator Controller
4. Service program start-up
5. Controller setting item chart
6. Checks before parts and/or controller setting change
7. Parts change
8. Adjustment of control link and controller
9. Resetting of protection
10. Disconnection of PC and actuator controller
11. Confirmation of stop solenoid
12. Confirmation of engine stop
13. Personal Computer Set-up (How the check when computer program does not start)
14. Malfunction display
15. Tunable Value List
SERVICE MANUAL REVISION REQUEST FORM
8. Maintenance Manual: Recomended Service Program (KO27600)
Format: PDF, 42 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
MAJOR COMPONENTS PREVENTIVE SERVICE SCHEDULE
HITACHE SCHEDULED DIAGNOSTIC SERVICE
CHECK LISTS FOR PERFORMANCE AND COMPONENTS
RECOMMENDATION OF PREVENTIVE SERVICE TO CUSTOMER
RECOMMENDED PARTS CATALOG FOR PREVENTIVE SERVICE
9. Operational Principle Manual (TO18EE-00)
Format: PDF, 246 pages
Language: English
Table of Contents:
GENERAL
SPECIFICATIONS
COMPONENT LAYOUT
SYSTEM
CONTROL SYSTEM
HYDRAULIC SYSTEM
ELECTRICAL SYSTEM
COMPONENT OPERATION
PUMP DEVICE
SWING DEVICE
CONTROL VALVE
PILOT VALVE
TRAVEL DEVICE
SIGNAL CONTROL VALVE
OTHERS(UPPERSTRUCTURE)
OTHERS(UNDERCARRIAGE)
10. Wiring Diagram (TT183E00CIR)
Format: PDF, 4 pages
Language: English
11. Assembly Manual (KO26900_POD)
Format: PDF, 192 pages
Language: English
Table of Contents:
COVER
Foreword
1. Precautions
2. Workers plan (Loader front)
2'. Workers plan (Backhoe front)
3. Parts check
4. Preparations (Loader front)
5. Preparations (Backhoe front)
6. Machines, apparatus, tools, and materials necessary for assembly
ASSEMBLY OF UPPERSTRUCTURE
MOUNTING PROCEDURE FOR LOADER FRONT-END ATTACHMENT
MOUNTING PROCEDURE FOR BACKHOE FRONT-END ATTACHMENT
CHECKS & PERFORMANCE STANDARDS
10. Check after completing of assembly
11. Checking machine performance
BACK COVER
12. Training Text: EX1200-5-5c Tech ILT (EX1200-5-5c_Tech_ILT)
Format: PDF, 289 pages
Language: English
13. Check Sheets: UT Inspection (Backhoe Front) (KO274BE00)
Format: PDF, 52 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
DISTRIBUTION OF THE INSPECTION SHEET
DEFINITION OF THE DEFECT LENGTH IN ULTRA-SONIC
INSPECTION PROCEDURE
EVALUATION OF DEFECT HEIGHT (H)BY DISTANCE CORRECTION TECHNIQUE AT INTERNAL BULKHEAD
ULTRA-SONIC EXAMINATION REPORT FOR THE STRUCTURE
Track Frame
Loader Boom
Loader Arm
14. Check Sheets: UT Inspection (Loader Front) (ko274l00)
Format: PDF, 58 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
DISTRIBUTION OF THE INSPECTION SHEET
DEFINITION OF THE DEFECT LENGTH IN ULTRA-SONIC TESTING
INSPECTION PROCEDURE
EVALUATION OF DEFECT HEIGHT(H)BY DISTANCE CORRECTION TECHNIQUE AT INTERNAL BULKHEAD
ULTRA-SONIC EXAMINATION REPORT FOR THE STRUCTURE
Track Frame
Loader Boom
Loader Arm
15. Check Sheets: Visual Inspection (Loader Front) (KO275L00)
Format: PDF, 38 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
COMPLETING AND SUBMITTING THE INSPECTION SHEETS
INSPECTION PROCEDURE
STRUCTURE VISUAL INSPECTION CHECK REPORT
Track Frame
Side Frame
Main Frame
Loader Boom
Loader Arm
16. Check Sheets: Completed Assembly (KO27000)
Format: PDF, 25 pages
Language: English
Table of Contents:
COVER
FOREWORD
COMPLETED ASSEMBLY CHECK REPORT FOR THE EX1200-5
UNDERCARRIAGE/SUPERSTRUCTURE
FRONT-END ATTACHEMNT
ELECTRICAL SYSTEM FUNCTION CHECK SHEETS
IMPLEMENT SPEED CHECK SHEETS
17. Check Sheets: Daily and Weekly Maintenance (KO27100)
Format: PDF, 5 pages
Language: English
18. Check Sheets: Monthly Maintenance (KO27200)
Format: PDF, 55 pages
Language: English
Table of Contents:
COVER
1. 50 TO 1250 HOURS
2. 1500 TO 2500 HOURS
3. 2750 TO 3750 HOURS
4. 4000 TO 5000 HOURS
5. 5250 TO 6250 HOURS
6. 6500 TO 7500 HOURS
7. 7750 TO 8750 HOURS
8. 9000 TO 10000 HOURS
9. 10250 TO 11250 HOURS
10. 11500 TO 12500 HOURS
11. 12750 TO 13750 HOURS
12. 14000 TO 15000 HOURS
13. 15250 TO 16250 HOURS
14. 16500 TO 17500 HOURS
15. 17750 TO 18750 HOURS
16. 19000 TO 20000 HOURS
19. Check Sheets: Parts Visual Check (ko27300)
Format: PDF, 41 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
INSPECTION PROCEDURE
PRECAUTIONS FOR INSPECTION
PRECAUTIONS IN USING THE PARTS VISUAL CHECK SHEET
PIPING SYSTEM
ELECTRIC PARTS
IMPORTANT CHECKS
20. Check Sheets: Visual Inspection (Bachkhoe Front) (KO275BE00)
Format: PDF, 40 pages
Language: English
Table of Contents:
COVER
INTRODUCTION
COMPLETING AND SUBMITTING THE INSPECTION SHEETS
INSPECTION PROCEDURE
STRUCTURE VISUAL INSPECTION CHECK REPORT
Track Frame
Side Frame
Main Frame
Backhoe BE Boom
Backhoe Arm
Included in the package | |
Workshop Manual | 5 |
Troubleshooting Manual | 1 |
Engine Technical Manual | 1 |
Maintenance Manual | 1 |
Operational Principle Manual | 1 |
Wiring Diagram | 1 |
Assembly Manual | 1 |
Check Sheets | 8 |
Training Text | 1 |
Covered | |
Model Class | EX1200 |
Generation | 5C |
Truck Type | Hydraulic Excavator |
Truck Models | EX1200-5C |
Hitachi EX1200-5C (S6R Engine) Hydraulic Excavator set of Service Manuals
- Brands Hitachi
- Product Code:Hitachi::EX1200-5C
- Availability:Ready to instant download
-
$49.90
Tags: EX1200-5C